Commercial grade dedication is a common process, and the standard is reasonable assurance, but many suppliers are compelled to go beyond reasonable assurance all the way to full certification. In this article, learn how changing the paradigm can save the nuclear industry millions of dollars. Case Study | 03/28/19 StressWave Case Study | Wind Farm A wind farm experienced a series of generator failures over a short amount of time. Using Curtiss-Wright's StressWave technology, the wind farm found early signs of degradation on a MW class wind turbine generator, resulting an approximately $155k in cost savings. Case Study | 02/22/19 FAMOS Case Study | NRG Energy Discover how the WA Parish Generating Station improved plant performance by integrating Curtiss-Wright's Fleet Asset Management and Optimization Solutions (FAMOS) suite with other applications, revealing subtle anomalies and power losses. Presentation | 01/01/18 2018 Symposium Presentations Curtiss-Wright's 2018 Symposium explored key topics in Plant Performance and Plant Optimization. Download the conference presentations here.